HOTEL THE LEBEN OSAKA
Use application | Hotel |
---|---|
Construction site | Chuo-ku, Osaka |
Opened on | January, 2022 |
Construction period | From March 19, 2020 to January 11, 2022 |
Structure / Scale | S / 1 basement floor, 15 above ground |
Total floor space | 6,270.22 ㎡ |
Tags |
|